To Content
  • Re-routing BAB 1 Leverkusener Bridge

  • The renovation of the autobahn BAB1 - Leverkusener Brücke across the river Rhine will necessitate a large-scale re-routing of several pipelines in order to clear the site for the new motorway bridge.The renovation of the motorway has become necessary because the existing construction is no longer able to cope with the considerably increased traffic load and ...

    ⟩ Read more

  • Construction of NOWAL pipeline (DN 1000)

  • The Gascade Gastransport GmbH is planning the construction of a pipeline (DN 1000, PN 100) with a length of ca. 26 km to support the L-H-gas conversion. The pipeline will connect the towns of Rehden in Lower Saxony and Drohne in North Rhine-Westphalia and is therefore an important link to transport H-gas from the North into the centres of consumption in West ...

    ⟩ Read more

  • Re-routing of natural gas pipeline Werne-Schlüchtern

  • In the course of the construction of the B 252/ B62 from Münchhausen, Wetter and Lahntal carried out by Hessen Mobil, it became necessary to re-route the natural gas pipeline Werne-Schlüchtern (line No. 56) due to several crossings with the B 252/ B 62. Open Grid Europe GmbH has commissioned a joint venture formed by the Anton Meyer GmbH and the FRIEDRICH ...

    ⟩ Read more

  • Rehabilitation of gas pipeline (FGL) 214

  • The construction project for the gas pipeline FGL 214 was carried out by a joint venture under the technical direction of the FRIEDRICH VORWERK KG (GmbH & Co.), branch office Halle/Saale during the period from June 6th, 2016 to October 21st, 2016. The 29 individual measures were spread over a distance of 219 km. The main parts of the four switch off-sections ...

    ⟩ Read more

  • Loop line Schwandorf Forchheim

  • The joint venture “ARGE Bavaria Loop Nord“ (Streicher/PPS/VORWERK) will build a loop line from the Open Grid Europe station Schwandorf near the city of Regensburg to the station Arresting. The loop line with a length of 62 km has a diameter of DN1000 and is designed for a pressure of 100 bar. The expansion is supposed to allow for the connection of new natural ...

    ⟩ Read more

next