  • Communal waterworks ZBL Canitz-Thallwitz DN 900

  • Relocation of long-distance water pipeline DN 900, ST-ZMPEv, 146 m, incl. laying of protective pipe DN 1200, 40 m and cable conduit DN 100, DN 75, 40 m, construction of cathodic corrosion protection plant

  • Customer

    Kommunale Wasserwerke Leipzig GmbH, Johannisgasse, 04103 Leipzig

    Order Type

    Main contractor

    Construction time

    09/2020 - 12/2020

  • High pressure line gas pressure regulating station West

  • Removal of dredging damage to high pressure line DN200, DP16, TN131 and rerouting of a high pressure gas pipeline DN200, DP16, 16 m, including installation of a DN200 gate valve with two DN50 blowers, civil engineering and pipeline construction, demolition of an old gas pressure regulation system building and restoration of the surfaces.

  • Customer

    Stadtwerke Schkeuditz GmbH, Edisonstr. 36, 04435 Schkeuditz

    Order Type

    Main contractor

    Construction time

    08/2020 - 09/2020

  • Vogelkamp, Sluice relocation Lot 1-4

  • Lot 1: Relocation of all pipe supports; Lot 2: Relocation of 2x125 m waste water pressure pipes da 800 and da 400, PE 100; Lot 3: Relocation of 125 m drinking water pipe, DN 500, GGGZm; Lot 4: 125 m empty pipe relocation da 50 in open construction in the existing pipe trench.

  • Customer

    Hamburger Wasserwerke GmbH, Hamburger Stadtentwässerung AöR, Hamburg Wasser Service und Technik GmbH, Billhorner Deich 2/ Ausschläger Allee 169, 20539 Hamburg

    Order Type

    Main contractor

    Construction time

    07/2020 - 12/2020

  • Relocation of district heating pipeline 01.01. Murmansker Straße

  • Relocation of district heating pipeline DN 200 KMR, preparation of two house connections, and dismantling of two underground shut-off valves.

  • Customer

    EVH GmbH, Bornknechtstraße 5, 06108 06108 Halle (Saale)

    Order Type

    Main contractor

    Construction time

    06/2020 - 09/2020

  • Pipe laying 2nd Amsinckstraße bridge, 3rd construction phase Hammerbrook

  • Pipe installation underneath a new bridge incl. connection of the pipes to the existing network. 2xDN 500 steel, 2x50m, PN 10, material: S235JR

  • Customer

    Hamburger Wasserwerke GmbH, Billhorner Deich 2, 20539 Hamburg

    Order Type

    Main contractor

    Construction time

    06/2020 - 07/2020