High pressure line gas pressure regulating station West
Removal of dredging damage to high pressure line DN200, DP16, TN131 and rerouting of a high pressure gas pipeline DN200, DP16, 16 m, including installation of a DN200 gate valve with two DN50 blowers, civil engineering and pipeline construction, demolition of an old gas pressure regulation system building and restoration of the surfaces.
Customer
Stadtwerke Schkeuditz GmbH, Edisonstr. 36, 04435 Schkeuditz
Order Type
Main contractor
Construction time
08/2020 - 09/2020
Vogelkamp, Sluice relocation Lot 1-4
Lot 1: Relocation of all pipe supports; Lot 2: Relocation of 2x125 m waste water pressure pipes da 800 and da 400, PE 100; Lot 3: Relocation of 125 m drinking water pipe, DN 500, GGGZm; Lot 4: 125 m empty pipe relocation da 50 in open construction in the existing pipe trench.
Customer
Hamburger Wasserwerke GmbH, Hamburger Stadtentwässerung AöR, Hamburg Wasser Service und Technik GmbH, Billhorner Deich 2/ Ausschläger Allee 169, 20539 Hamburg
Order Type
Main contractor
Construction time
07/2020 - 12/2020
New installation of gas pipeline 442
DN 500/400; steel; 125 km; DP 84
Customer
Ferngas Netzgesellschaft mbH, Reichswaldstraße 52, 90571 Schwaig
Order Type
Consortium
Construction time
06/2019 - 12/2023
Extension of the pressure stage transition (DÜG) Börnicke
Relocation FGL 303.01 DN 600 approx. 65m, relocation FGL 306 DN 1100 approx. 75m, pressure stage transition DN 800, partly above ground
Customer
ONTRAS Gastransport GmbH, Maximilianallee 4, 04129 Leipzig
Order Type
Main contractor
Construction time
04/2019
Replacement of the Buckow transfer station
Planning, delivery and construction of a functional transfer station. General contractor, civil engineering & pipeline construction, plant construction, apparatus engineering and outdoor facilities. DN 600, PN 67.5
Customer
NBB Netzgesellschaft Berlin-Brandenburg mbH & Co. KG, An der Spandauer Brücke 10, 10178 Berlin
Order Type
Main contractor
Construction time
03/2019 - 09/2020